Thermal flue gas cleaning at upstream industrial furnace plant

Birk supplies a thermal afterburner / thermal exhaust gas cleaning system to a renowned industrial furnace manufacturer to equip their in-house pilot plant. The exhaust air purification plant was designed for a raw gas volume flow of only 15 m³/h from the exhaust gases of a special industrial furnace.

The plant has a special design of the raw gas inlet, as well as a customer-specific arrangement of the other plant components in order to meet the limited space conditions at the installation site, this also played a decisive role in the design of the piping of the individual media. The plant is controlled and operated via the in-house PLC S7-based control system with touch display. The system is designed as a compact version, which means that it is delivered ready for operation, i.e. completely electrically and mechanically installed.

Go back